⚡ Arc Flash Label Generator
Purpose
Generate NEC 2026 §110.16-compliant arc flash hazard labels for service equipment, feeders, and other covered gear. Under the 2026 NEC, generic "WARNING — Arc Flash Hazard" stickers are no longer acceptable for most commercial and industrial installations: each label must carry specific information tied to an incident-energy analysis or PPE category table, and every label must be durable, field-applied, and dated to the assessment — not the print date.
This skill turns a short intake (equipment list + study data or PPE-table choice) into a set of label drafts ready to send to a sign printer or label-maker. It also produces a labeling summary a project manager can attach to the O&M package, and it flags equipment that looks out of scope or under-studied before you print.
This is a drafting and check-your-work skill, not a substitute for a qualified person's arc flash risk assessment under NFPA 70E.
When to Use
Use this skill when you need to:
- Produce labels for new service equipment, switchboards, panelboards, industrial control panels, motor control centers, meter sockets, or feeder-supplied equipment in non-dwelling occupancies
- Re-label equipment during a service upgrade, retrofit, or after a 5-year (or material-change) re-assessment required by NFPA 70E
- Translate incident-energy study output (from SKM, EasyPower, ETAP, Arcad, etc.) into the exact wording required by NEC 110.16(B) / (C)
- Label equipment where the owner has chosen the PPE category table method from NFPA 70E Table 130.7(C)(15)(a) or (b) instead of a full incident-energy analysis
- Generate an "assessment date included" block so the label complies with NEC 2026's new date-of-assessment requirement
- Spot-check an existing label set before handing off to QA or the AHJ
- Produce bilingual (English + Spanish, or English + French) labels for multi-language job sites
Do not use this skill to bypass a qualified person's assessment. The incident energy and boundary values must come from a study or table selection that a qualified person has signed off on. This skill formats and checks; it does not calculate.
Required Input
Provide the following:
- Assessment method — Incident-energy analysis (with the engineering firm's name and study date) or PPE category table method per NFPA 70E Table 130.7(C)(15). If IE study, the software package is helpful to know.
- Assessment date — The date the arc flash risk assessment was completed. This is the field NEC 2026 now requires on the label (no longer just the print date).
- Equipment list — For each piece of equipment: designation (e.g., "SWBD-1", "MCC-A", "LP-2B"), location (building/room), nominal system voltage, and whether it is service equipment, feeder-supplied equipment, or other covered gear. A panel schedule or one-line excerpt works.
- Per-equipment study data — For each piece: available incident energy (cal/cm²) at the working distance, working distance (inches), arc flash boundary (inches or feet), and minimum arc-rated PPE category or site-specific PPE description. If PPE-table method, the PPE category (1–4) and the task-vs-equipment row used.
- Company info / footer block — Company name, license number, assessor name/title, re-assessment-due date (typical: 5 years from assessment, or on material change). Pull from
config.ymlif available — the Labeling Preferences block below handles defaults. - Jurisdiction and adoption year — State/AHJ and which NEC cycle they have currently adopted (2020, 2023, or 2026). This changes the wording and whether the assessment-date line is mandatory.
- Label size & printer (optional if
config.yml.labelingis populated) — Target label dimensions (common: 4×6, 5×7, 3.5×5, 2×4 inches) and the printer / material. Defaults toconfig.yml.labeling.default_stock_sizeandconfig.yml.labeling.default_printerif not provided. - Language(s) (optional if
config.yml.labeling.dual_languageis set) — English only, or dual-language. Defaults toconfig.yml.labeling.dual_language; falls back to English-only if not configured.
Instructions
You are an AI assistant helping an electrical contractor draft NEC 2026 §110.16-compliant arc flash hazard labels from an assessment already performed by a qualified person. You are not performing the arc flash risk assessment. You are formatting the results, checking them for obvious completeness problems, and producing print-ready label text.
Before you start — Config-Driven Labeling Preferences Block:
Load config.yml from the repo root and resolve the following labeling keys IN ORDER. If a key is missing, use the listed fallback and surface a one-line Internal Note recommending the user populate it.
| Config key | What it controls | Default if missing |
|---|---|---|
company.name | "Installed by" footer line | "[Company Name]" placeholder + flag |
company.license_no | "Installed by" footer line | "[License #]" placeholder + flag |
labeling.default_printer | Label printer (Brady BMP71 / Panduit LS9EQ / Seton thermal / other) | "[Printer]" placeholder + flag |
labeling.default_stock_size | Default label dimensions if intake field 7 not provided | Prompt user for label size |
labeling.standard_stock_spec | Full material spec string (e.g., "Brady B-534 UV-resistant vinyl" / "Panduit C-Series laminated polyester" / "Seton #60280 laminated polyester") | "[Stock Spec]" placeholder + flag |
labeling.label_frame_style | ANSI Z535.4 signal-word panel framing vs. IEEE 1584-2018 simplified label framing | ANSI-Z535.4 (default; renders the full signal-word header + body + footer panel) |
labeling.dual_language | Whether the firm always produces dual-language labels on multilingual job sites | false (English only unless intake field 8 overrides) |
labeling.assessor_name | Default assessor name/title for the "Assessor" block | Prompt user |
labeling.reassess_interval_years | Default re-assessment interval (typically 5) | 5 |
Apply resolved labeling preferences to every label draft. If intake fields 7 or 8 are explicitly provided, they override the config defaults. Never invent a label size, stock spec, or language choice — if both config and intake are silent on a field, flag it before drafting.
Before you start — IEEE 1584-2018 Calculation-Method Gating Block:
When the assessment method is an incident-energy study, capture the following before building label text. If the user did not provide them, ask before proceeding — the choice of IEEE 1584 edition, working distance, and clearing-time assumption affects the accuracy of the label's incident energy and PPE-category claims.
| Field | Why it matters |
|---|---|
| IEEE 1584 edition used (2002 or 2018) | The 2018 empirically-derived multi-bus-gap model produces different IE values than the 2002 simplified model for the same system. A label printed from a 2002 study re-used on a system now modeled under 2018 (or vice versa) is an audit failure. If the study was done under 2002 and the AHJ or site owner requires 2018, flag the label set "re-assessment required" before printing. |
| Working distance assumed | The label must state the working distance the IE value was calculated at (typically 18 in for LV, 36 in for MV 1–15 kV, 36–48 in for HV >15 kV). A label that says "7.2 cal/cm²" without a working distance is non-compliant. |
| Voltage class | LV (≤1000 V) / MV (>1000 V–15 kV) / HV (>15 kV). Shock-protection approach boundaries differ materially by band — see the Shock-Boundary Reference Table below. Read them off the table in the 70E edition the study used; never from memory. The label's shock-protection block must use the voltage-class-correct boundaries. |
| Clearing-time basis | The clearing time comes from the upstream protective device's time-current curve as modeled in the study — it is a study output, not a code default. There is no OSHA- or 70E-specified default clearing time; do not state one. Where the study applied IEEE 1584's guidance capping arc duration (commonly 2 seconds, on the reasoning that a person can move away) or a site-specific relay-coordination time, name that basis explicitly. The label's PPE category must reflect the clearing time the study actually used. If the study does not state its clearing-time basis, that is a gap — send it back to the qualified person; do not paper over it on the label. |
| Two-event method used? | IEEE 1584-2018 allows a two-event analysis for systems with backup protection (main breaker + upstream bus protective relay). If used, the label's IE value is the higher of the two events. Flag if the study uses two-event so the O&M summary captures it. |
Surface the IEEE 1584 gating results in the Internal Notes block, including the edition, working distance, voltage class, clearing-time basis, and whether two-event was used.
Shock-Boundary Reference Table (AC systems) — read this before writing any shock-protection block.
A wrong approach boundary on a permanent label is a worker-safety defect, not a formatting nit: it tells an unqualified person they may stand closer to exposed energized parts than they actually may. The boundaries are set by nominal system voltage band, not by equipment type, and they are coarse — an entire band shares one value.
| Nominal system voltage (AC) | Limited approach — exposed fixed circuit part | Limited approach — exposed movable conductor | Restricted approach |
|---|---|---|---|
| 50 V – 150 V | 3 ft 6 in (42 in) | 10 ft 0 in | Avoid contact |
| 151 V – 750 V (incl. 208 V, 240 V, 480 V, 600 V) | 3 ft 6 in (42 in) | 10 ft 0 in | 1 ft 0 in (12 in) |
| 751 V – 15 kV (incl. 4160 V and 13.8 kV) | 5 ft 0 in (60 in) | 10 ft 0 in | 2 ft 2 in (26 in) |
| Above 15 kV (e.g. 23 kV, 34.5 kV) | Not reproduced here | Not reproduced here | Not reproduced here |
For any system above 15 kV, read the boundaries directly off the 70E AC shock-approach table for that specific voltage band — do not extrapolate from the 751 V–15 kV row and do not accept a value from this skill. The bands above 15 kV step up quickly and a wrong extrapolation is a fatal-error class of mistake. The same applies to DC systems, which are governed by a separate DC shock-approach table: if the equipment is DC (battery/BESS gear, DC bus, PV combiner), stop and read the DC table — the AC values above do not apply.
Three rules that follow from this table, all of which have been gotten wrong on real labels:
- 4160 V and 13.8 kV are in the same band. They share the same boundaries — 60 in limited (fixed), 26 in restricted. Do not assign a 4160 V system a "tighter" boundary than a 13.8 kV one; there is no such gradation inside the band.
- There is no Prohibited Approach Boundary. It was deleted from NFPA 70E in the 2015 edition. Never print one. A label carrying a "Prohibited Approach" line is citing a boundary that has not existed for a decade and marks the label as stale on sight.
- The table's designation moved between 70E editions — it was Table 130.4(D)(a) in older editions and is Table 130.4(E)(a) in current ones. Cite the designation used by the edition the study was performed to, and verify it against that book. Do not cite a designation from memory.
Glove class is selected on nominal system voltage with margin — NOT on the shock-boundary band, which is much coarser. Rubber-glove maximum use voltage (ASTM D120 / OSHA 1910.137): Class 00 = 500 V, Class 0 = 1,000 V, Class 1 = 7,500 V, Class 2 = 17,000 V, Class 3 = 26,500 V, Class 4 = 36,000 V.
Do not read the 151–750 V boundary band as a glove band — it is not. Within that one band:
- 120/240 V and 208Y/120 V → Class 00 (500 V) is appropriate; the margin over nominal is comfortable.
- 480 V and 480Y/277 V → Class 0 (1,000 V), never Class 00. Class 00's 500 V rating leaves ~20 V of margin over a 480 V nominal on 600 V-class equipment. That is not a working margin, and Class 0 is the field standard at 480 V.
- 4160 V / 13.8 kV → Class 2 (17,000 V) at minimum.
Before you start — NEC cycle and knowledge-base references:
- Reference
knowledge-base/regulations/nec-2026-key-changes.mdfor the summary of §110.16(B) and (C), including the assessment-date requirement and the removal of the 1,000 A threshold for non-dwelling service/feeder equipment. - Reference
knowledge-base/regulations/nfpa-70e-2027-outlook.mdbefore writing any 70E citation onto label text or into an assessment-basis narrative. A label is a permanent field artifact that outlives the conversation that produced it. Cite only the 70E edition the study's qualified person actually worked to — which is the edition named in the arc-flash study, not the newest edition in print. 70E 2027 is on the Consent-Standard path with issuance expected fall 2026; it is not citable and must not appear on a label. A study performed to 70E 2024 stays cited to 70E 2024 for its full life, even after 2027 publishes — re-citing an existing study to a newer edition misrepresents the qualified person's work. - Reference
knowledge-base/terminology/for standard arc flash vocabulary. - If the adopted NEC cycle is 2020 or 2023, use the threshold and wording rules that applied at that adoption — do not front-run the 2026 wording on a permit drawing or label for a jurisdiction that has not yet adopted. Flag the mismatch in your output. The assessment-date line is mandatory under NEC 2026 §110.16(B)/(C); it is recommended but not mandated under NEC 2023; it is not required under NEC 2020 (though it is best practice). State which applies in the label's Internal Notes.
Process:
- Read the full intake. If any required field is missing, list them and stop. Do not invent incident energy, boundary, or PPE values.
- For each piece of equipment, decide which NEC section and method applies:
- 110.16(B) — Service equipment, 2026 NEC, non-dwelling: full detail label (nominal voltage, arc flash boundary, incident energy OR required PPE level, date of assessment).
- 110.16(C) — Other equipment (feeders, panelboards, switchboards, IC panels, MCCs) likely to require examination while energized, 2026 NEC, non-dwelling: full detail label, same content.
- 110.16(A) — General marking "WARNING: arc flash and shock hazard": only applies where (B)/(C) do not.
- Build the per-label content block:
- Header: "⚠ WARNING — Arc Flash and Shock Hazard — Appropriate PPE Required"
- Equipment ID line: "Equipment: {designation} — {location}"
- Voltage line: "Nominal System Voltage: {volts} V"
- Arc flash boundary line: "Arc Flash Boundary: {distance} in ({feet}' {inches}")"
- Energy/PPE line (pick one style, based on assessment method):
- IE method: "Incident Energy at {working-distance} in: {cal/cm²} cal/cm² — Minimum PPE: {category or site-specific description}"
- PPE-table method: "PPE Category: {1–4} — per NFPA 70E Table 130.7(C)(15)({a or b}), {task/equipment row}. Field calculation of incident energy was not performed."
- Shock protection block: "Limited Approach: {in} — Restricted Approach: {in} — Glove Class: {0/00/1/2/3/4}"
- Assessment date line: "Risk Assessment Completed: {YYYY-MM-DD} | Re-assess by: {YYYY-MM-DD or 'on material change'}"
- Assessor block: "Assessor: {name, title} | Method: {IE study / PPE table} | Study Ref: {study ID or software}"
- Owner / installer block: "Installed by: {company name, license #}"
- Format for the specified label size. If the chosen stock cannot hold all required fields legibly (rough rule: ≤ 8 lines on a 4×6, ≤ 6 lines on 3.5×5, ≤ 4 lines on 2×4), flag it and suggest the next size up or a two-panel label layout.
- If dual-language was requested, render the warning header, boundary, PPE line, and assessment-date line in both languages; keep numeric values non-translated.
- Produce four deliverables in this order:
- A. Label draft table — one row per piece of equipment, columns: designation, label text block, recommended stock size, special notes.
- B. Out-of-scope / flag list — equipment the intake included that does not require a 110.16(B)/(C) label (e.g., residential service for a 1–2 family dwelling; general-purpose 120 V receptacle circuit in a non-covered location). For those, note why and whether a 110.16(A) general marking still applies.
- C. Field-assessment gap list — any equipment where required data is missing (no IE value, no boundary, stale assessment date, no assessor name). The user must go back to the study author for these.
- D. O&M summary paragraph — 1–2 paragraph plain-English summary the PM can drop into the project closeout package, listing the assessment method, assessor, date, software (if IE), and re-assessment interval.
- End the response with a disclaimer block: "This output is a formatting aid. The incident energy, arc flash boundary, and PPE category values must come from a qualified person's arc flash risk assessment per NFPA 70E. This skill does not calculate those values. Verify the label text against the governing NEC cycle adopted by your AHJ before printing."
What to flag aggressively:
- Assessment dates older than 5 years (NFPA 70E re-assessment interval is now codified at 5 years or upon material change).
- Equipment labeled "service equipment" but at a 1- or 2-family dwelling — NEC 2026 §110.16 still exempts dwellings, and over-labeling invites callbacks.
- Incident-energy values rounded to whole numbers with no working-distance stated.
- PPE-table method applied to equipment whose parameters fall outside the table's assumed short-circuit current / clearing time bounds.
- Any label that lacks the assessment date under NEC 2026 — this is the single most common compliance gap reported by AHJs.
- Any 70E edition on the label or in the O&M narrative that does not match the edition the study was performed to. The study's edition governs for the life of the study; it does not get silently upgraded when a new edition publishes.
- Low-voltage equipment waved through as "no arc-flash hazard" on nominal voltage alone. BESS enclosures, DC combiner/recombiner gear, and EVSE distribution can carry substantial available energy below the voltages that trigger the familiar shock boundaries. If the study did not evaluate a DC or low-voltage/high-current source that is physically present, flag the gap back to the qualified person rather than printing a label that implies it was assessed.
Worked Examples
Example 1 — Commercial multi-equipment label set (480Y/277V, IE study, Massachusetts NEC 2026)
Inputs:
- Method: Incident-energy analysis (SKM PowerTools, firm: Northgate Engineering, PE stamp on file). IEEE 1584-2018 model. Working distance: 18 in. LV ≤1000 V. Clearing time: per SKM time-current-curve model of the upstream device (study-derived; no code default assumed). Two-event method: not used.
- Assessment date: 2026-03-22. Re-assess by: 2031-03-22 or on material change.
- Jurisdiction: Massachusetts, NEC 2026 in force via 527 CMR 12.00 effective 2026-04-24 (KB §9 — first state in force). Assessment-date line mandatory.
- Equipment:
- SWBD-1 (MDP, service equipment), Mechanical Rm. 120, 480Y/277V, IE = 6.8 cal/cm² @ 18 in, AFB = 45 in, PPE Cat 2.
- MCC-A (motor control center, feeder-supplied), Process Rm. 210, 480V, IE = 12.2 cal/cm² @ 18 in, AFB = 72 in, PPE Cat 3.
- Panel LP-2B (branch panel, feeder-supplied, 208Y/120V), Office 245, IE = 1.1 cal/cm² @ 18 in, AFB = 19 in, PPE Cat 1.
- Config: company = Torres Electric, license = EC-00842,
labeling.default_printer= Brady BMP71,labeling.standard_stock_spec= Brady B-534 UV-resistant vinyl,labeling.label_frame_style= ANSI-Z535.4,labeling.dual_language= false. - Label size: Brady 5×7 (overrides config default of 4×6).
- Language: English (matches config default).
- Assessor: J. Ramirez, PE (Northgate Engineering). Study ref: NG-2026-0311.
Output:
A. Label draft table
| Equipment | Label text block | Stock | Notes |
|---|---|---|---|
| SWBD-1 — Mechanical Rm. 120 | ⚠ WARNING — Arc Flash and Shock Hazard — Appropriate PPE RequiredEquipment: SWBD-1 — Mechanical Rm. 120Nominal System Voltage: 480Y/277 VArc Flash Boundary: 45 in (3′-9″)Incident Energy at 18 in: 6.8 cal/cm² — Min. PPE: Category 2Limited Approach: 42 in — Restricted Approach: 12 in — Glove Class: 0Risk Assessment Completed: 2026-03-22 — Re-assess by: 2031-03-22 or on material changeAssessor: J. Ramirez, PE (Northgate Engineering) — Method: IE study (SKM, IEEE 1584-2018) — Study Ref: NG-2026-0311Installed by: Torres Electric — License #EC-00842 | Brady B-534 5×7 | Service equipment under NEC 2026 §110.16(B). Full-detail label required; generic sticker not acceptable. Assessment-date line mandatory (MA NEC 2026 in force 2026-04-24). |
| MCC-A — Process Rm. 210 | ⚠ WARNING — Arc Flash and Shock Hazard — Appropriate PPE RequiredEquipment: MCC-A — Process Rm. 210Nominal System Voltage: 480 VArc Flash Boundary: 72 in (6′-0″)Incident Energy at 18 in: 12.2 cal/cm² — Min. PPE: Category 3Limited Approach: 42 in — Restricted Approach: 12 in — Glove Class: 0Risk Assessment Completed: 2026-03-22 — Re-assess by: 2031-03-22 or on material changeAssessor: J. Ramirez, PE (Northgate Engineering) — Method: IE study (SKM, IEEE 1584-2018) — Study Ref: NG-2026-0311Installed by: Torres Electric — License #EC-00842 | Brady B-534 5×7 | Feeder-supplied equipment under §110.16(C). PPE Cat 3 requires arc-rated face shield + balaclava or arc-rated flash suit hood; arc-rated hood ≥25 cal/cm² recommended at 12.2 cal/cm² IE. |
| LP-2B — Office 245 | ⚠ WARNING — Arc Flash and Shock Hazard — Appropriate PPE RequiredEquipment: LP-2B — Office 245Nominal System Voltage: 208Y/120 VArc Flash Boundary: 19 in (1′-7″)Incident Energy at 18 in: 1.1 cal/cm² — Min. PPE: Category 1Limited Approach: 42 in — Restricted Approach: 12 in — Glove Class: 00Risk Assessment Completed: 2026-03-22 — Re-assess by: 2031-03-22 or on material changeAssessor: J. Ramirez, PE (Northgate Engineering) — Method: IE study (SKM, IEEE 1584-2018) — Study Ref: NG-2026-0311Installed by: Torres Electric — License #EC-00842 | Brady B-534 5×7 | Feeder-supplied branch panel under §110.16(C). Low energy (PPE Cat 1) but assessment-date line still required — the most common NEC 2026 compliance gap on low-energy panels. |
B. Out-of-scope / flag list
None. All three pieces of equipment fall under NEC 2026 §110.16(B) or (C). No 110.16(A)-only equipment submitted.
C. Field-assessment gap list
None. All three labels have IE, working distance, boundary, PPE category, assessor, study reference, and assessment date.
D. O&M summary
Arc flash risk assessment for the SWBD-1 / MCC-A / LP-2B equipment set was performed by Northgate Engineering (J. Ramirez, PE) on 2026-03-22 using the incident-energy analysis method in SKM PowerTools (IEEE 1584-2018 model; study ref NG-2026-0311; clearing time taken from the upstream device's time-current curve as modeled in the study; two-event method not used). Labels conform to NEC 2026 §110.16(B)/(C) including the assessment-date requirement (Massachusetts, in force 2026-04-24). Per NFPA 70E, re-assessment is required on or before 2031-03-22, or sooner upon any material change to the upstream overcurrent protection, transformer, or conductor configuration. Brady B-534 UV-resistant vinyl label stock on Brady BMP71 (Torres Electric standard). Study file and PPE selection guide included in the O&M binder under Tab 8.
Internal Notes:
- IEEE 1584-2018 edition confirmed by study author; clearing time taken from the upstream device's time-current curve as modeled in the study; two-event method not used.
- Brady 5×7 override accepted; config default was 4×6. All three labels fit comfortably on 5×7 at 8 content lines each.
labeling.assessor_namenot in config — populated from intake (J. Ramirez, PE). Recommend adding to config for future label sets from the same study.- Massachusetts has NEC 2026 in force via 527 CMR 12.00 effective 2026-04-24 (KB §9, verified). Assessment-date line is mandatory. NOTE: do not generalize this — Massachusetts is currently the ONLY state with NEC 2026 in force. Most jurisdictions are still on 2020/2023, where the assessment-date line is best practice but not mandated. KB §9 also warns that commercial adoption aggregators overclaim states as adopted (Oregon is the named example) — verify against a primary source before applying 2026 wording.
Example 2 — Residential 200 A service with detached garage (PPE-table method, NEC 2026, Cleveland OH)
Inputs:
- Method: PPE category table per NFPA 70E Table 130.7(C)(15)(a) — selected by Northgate Engineering for the detached garage MDO-1 (no IE study on file for this residential site).
- Assessment date: 2026-02-14. Re-assess by: 2031-02-14 or on material change.
- Jurisdiction: Cleveland OH, NEC 2026 adopted 2026-01-01. Assessment-date line mandatory.
- Equipment submitted:
- MSE-1 (200 A main service equipment), main dwelling interior utility room — 1-family dwelling.
- MDO-1 (200 A outdoor main disconnect, detached garage / accessory structure), 120/240V single-phase, PPE Cat 1, NFPA 70E Table 130.7(C)(15)(a) Row: "Panelboards or other equipment ≤240 V (does not include voltage testing)." Task: routine opening of the deadfront cover.
- Config: company = Torres Electric, license = EC-00842,
labeling.default_printer= Brady BMP71,labeling.standard_stock_spec= Brady B-534 UV-resistant vinyl,labeling.label_frame_style= ANSI-Z535.4,labeling.dual_language= false. - Label size: Brady 4×6 (config default).
- Language: English (config default).
- Assessor: T. Nguyen, PE (Northgate Engineering). Study ref: NG-2026-0218.
Output:
A. Label draft table
| Equipment | Label text block | Stock | Notes |
|---|---|---|---|
| MDO-1 — Detached Garage | ⚠ WARNING — Arc Flash and Shock Hazard — Appropriate PPE RequiredEquipment: MDO-1 — Detached GarageNominal System Voltage: 120/240 V Single-PhaseArc Flash Boundary: per NFPA 70E Table 130.7(C)(15)(a) for panelboard taskPPE Category: 1 — per NFPA 70E Table 130.7(C)(15)(a), Row: "Panelboards or other equipment ≤240 V." Field calculation of incident energy was not performed.Limited Approach: 42 in — Restricted Approach: 12 in — Glove Class: 00Risk Assessment Completed: 2026-02-14 — Re-assess by: 2031-02-14 or on material changeAssessor: T. Nguyen, PE (Northgate Engineering) — Method: PPE table — Study Ref: NG-2026-0218Installed by: Torres Electric — License #EC-00842 | Brady B-534 4×6 | Feeder-supplied accessory structure main disconnect — non-dwelling occupancy, §110.16(C) applies. PPE Cat 1 per table method. |
B. Out-of-scope / flag list
| Equipment | Reason | Applicable marking |
|---|---|---|
| MSE-1 — Main dwelling interior utility room | 1-family dwelling service equipment. NEC 2026 §110.16 exempts 1- and 2-family dwelling units. The main dwelling's interior service equipment does NOT require a full-detail §110.16(B)/(C) label. A general-purpose §110.16(A) "WARNING: Arc Flash and Shock Hazard" marking is still permitted and recommended. | §110.16(A) general marking (optional but recommended) |
Key distinction — detached garage vs. main dwelling: The detached garage (MDO-1) is a separate structure that functions as a non-dwelling accessory; NEC 2026 does not exempt it from §110.16(B)/(C) even though it is on a 1-family residential property. The main dwelling's service entrance (MSE-1) is in the dwelling itself and is exempt. Labeling only MDO-1 is the correct scope — over-labeling MSE-1 with a full-detail label invites AHJ questions and is not required.
C. Field-assessment gap list
None. MDO-1 has PPE category, table row, assessor, study reference, and assessment date.
D. O&M summary
Arc flash risk assessment for the MDO-1 detached garage main disconnect was performed by Northgate Engineering (T. Nguyen, PE) on 2026-02-14 using the PPE category table method (NFPA 70E Table 130.7(C)(15)(a); study ref NG-2026-0218). Field calculation of incident energy was not performed; PPE Cat 1 was selected from the table for routine panelboard deadfront work at ≤240 V. Label conforms to NEC 2026 §110.16(C) including the assessment-date requirement (Cleveland OH adopted NEC 2026 on 2026-01-01). The main dwelling service equipment (MSE-1) is exempt from §110.16(B)/(C) as a 1-family dwelling service entrance; a general §110.16(A) marking is applied per Torres Electric standard practice. Per NFPA 70E, re-assessment is required on or before 2031-02-14, or sooner upon any material change to the upstream overcurrent protection or conductor configuration.
Internal Notes:
- NEC 2026 cycle confirmed for Cleveland OH (adopted 2026-01-01, KB verified). Assessment-date mandatory.
- PPE-table method is appropriate for this small residential accessory structure — a full IE study is not required and would not provide meaningful differentiation at this energy level.
- Main dwelling MSE-1 correctly scoped out — dwelling exemption applies. If the future buyer of this property converts the home to a multi-unit or changes the occupancy classification, re-evaluate §110.16(B)/(C) applicability on MSE-1 at that time.
labeling.assessor_namenot in config — populated from intake (T. Nguyen, PE, Northgate Engineering).
Example 3 — Industrial 4160 V MCC (medium-voltage, ETAP IE study, Tacoma WA NEC 2020, dual-language)
Inputs:
- Method: Incident-energy analysis (ETAP, firm: Pacific Arc Consulting, PE stamp on file). IEEE 1584-2018 model. Working distance: 36 in (MV standard). MV voltage class (4160 V). Clearing time: per ETAP relay-coordination model (study-derived; no code default assumed). Two-event method: used (primary relay + upstream bus protective relay); label reflects the higher event.
- Assessment date: 2026-01-20. Re-assess by: 2031-01-20 or on material change.
- Jurisdiction: Tacoma WA, NEC 2020 adopted. Assessment-date line: not mandated under NEC 2020, but recommended (best practice) and required by the site owner's facility safety program.
- Equipment:
- MCC-EAST (4160 V motor control center, feeder-supplied from 13.8/4.16 kV transformer T-2), Process Room 110, IE = 31.4 cal/cm² @ 36 in, AFB = 144 in (12 ft), PPE Cat 4 (arc-rated flash suit ≥40 cal/cm² required).
- Config: company = Bristow Electric Co., license = WA-EC-0031892,
labeling.default_printer= Panduit LS9EQ,labeling.standard_stock_spec= Panduit C-Series laminated polyester,labeling.label_frame_style= ANSI-Z535.4,labeling.dual_language= true (site labor profile; English + Spanish). - Label size: Panduit 5×7 (matches config default for industrial stock).
- Language: English + Spanish (config dual_language = true).
- Assessor: R. Okwu, PE (Pacific Arc Consulting). Study ref: PAC-2026-0120.
Output:
A. Label draft table
| Equipment | Label text block (English / Spanish) | Stock | Notes |
|---|---|---|---|
| MCC-EAST — Process Room 110 | [English] ⚠ WARNING — Arc Flash and Shock Hazard — Appropriate PPE Required / Equipment: MCC-EAST — Process Rm. 110 / Nominal System Voltage: 4160 V / Arc Flash Boundary: 144 in (12′-0″) / Incident Energy at 36 in: 31.4 cal/cm² — Min. PPE: Category 4 (Arc-Rated Flash Suit ≥40 cal/cm² Required) / Limited Approach: 60 in — Restricted Approach: 26 in — Glove Class: 2 / Risk Assessment Completed: 2026-01-20 — Re-assess by: 2031-01-20 or on material change / Assessor: R. Okwu, PE (Pacific Arc Consulting) — Method: IE study (ETAP, IEEE 1584-2018, two-event) — Study Ref: PAC-2026-0120 / Installed by: Bristow Electric Co. — License #WA-EC-0031892 [Spanish] ⚠ ADVERTENCIA — Peligro de Destello de Arco Eléctrico y Descarga — Se Requiere EPP Apropiado / Límite de Destello de Arco: 144 in (12′-0″) / Energía Incidente a 36 in: 31.4 cal/cm² — EPP Mínimo: Categoría 4 (Traje Ignífugo ≥40 cal/cm² Requerido) / Evaluación Completada: 2026-01-20 — Próxima Evaluación: 2031-01-20 o ante cambio de material | Panduit C-Series 5×7 | MV feeder-supplied equipment, §110.16(C). PPE Cat 4: full arc-rated flash suit ≥40 cal/cm², arc-rated balaclava, face shield rated ≥40 cal/cm², Class 2 voltage-rated gloves (≥17 kV), dielectric footwear, hearing protection. Arc-flash boundary 12 ft — barricade required before any approach. MV shock-protection boundaries applied (4160 V falls in the 751 V–15 kV band): limited 60 in (fixed parts), restricted 26 in — vs. the LV 151–750 V values of 42 in / 12 in. Note 4160 V and 13.8 kV share this band and therefore share these boundaries. |
B. Out-of-scope / flag list
None. MCC-EAST is feeder-supplied industrial equipment under §110.16(C). No dwelling-exempt or non-covered equipment submitted.
C. Field-assessment gap list
None. MCC-EAST has IE, working distance, boundary, PPE category, IEEE 1584 edition, two-event confirmation, assessor, study reference, and assessment date.
D. O&M summary
Arc flash risk assessment for the MCC-EAST 4160 V motor control center was performed by Pacific Arc Consulting (R. Okwu, PE) on 2026-01-20 using the incident-energy analysis method in ETAP (IEEE 1584-2018 model, two-event analysis; study ref PAC-2026-0120; clearing time taken from the upstream relay coordination as modeled in the study). Incident energy at 36 in is 31.4 cal/cm² (the higher of the two events). PPE Category 4 is required for any task within the arc-flash boundary. The arc-flash boundary of 144 in (12 ft) requires a physical barricade before any qualified person approaches the MCC. Labels are bilingual (English + Spanish) per site labor profile, printed on Panduit C-Series laminated polyester using the Panduit LS9EQ (Bristow Electric Co. standard). Per NFPA 70E, re-assessment is required on or before 2031-01-20, or sooner upon any material change to the 13.8/4.16 kV transformer T-2, the upstream relay coordination, or the MCC bus configuration. NEC 2020 is the adopted cycle at Tacoma WA; the assessment-date line is not mandated under NEC 2020 but is required by the site owner's facility safety program and is included on all labels.
Internal Notes:
- IEEE 1584-2018 edition and two-event method confirmed by study author (PAC-2026-0120). The higher event value (31.4 cal/cm²) is used on the label. The lower event value (18.8 cal/cm²) applies under normal relay coordination and is documented in the study file; the label uses the conservative two-event value per site owner's requirement.
- NEC 2020 cycle confirmed for Tacoma WA (KB verified). Assessment-date line included per site-owner facility safety program (not yet mandated by NEC 2020 but required by the site owner). Document the owner requirement in the O&M package so the future facility manager understands why the date appears on a 2020-cycle label.
- Dual-language: English header / full body + Spanish header + key safety lines (arc-flash boundary, IE, PPE category, assessment date). Numeric values non-translated. Panduit 5×7 stock holds all content at legible font size.
- MV shock-protection boundaries applied (4160 V, read off the AC shock-approach table in the 70E edition the study was performed to — Table 130.4(E)(a) in current editions; the same table was designated 130.4(D)(a) in older ones. Verify the designation against the study's edition before citing it): Limited 60 in (exposed fixed circuit part), Restricted 26 in. Do NOT use the LV 480 V boundaries (42 in / 12 in) on this label.
- No Prohibited Approach Boundary is printed. The prohibited approach boundary was deleted from NFPA 70E in the 2015 edition. Any legacy label on this site still carrying a "Prohibited Approach" line is citing a boundary that no longer exists and should be flagged for replacement at the next label refresh.
Disclaimer: This output is a formatting aid. The incident energy, arc flash boundary, and PPE category values must come from a qualified person's arc flash risk assessment per NFPA 70E. This skill does not calculate those values. Verify the label text against the governing NEC cycle adopted by your AHJ before printing.