🔧 Maintenance Plan Generator
Purpose
Build a customized preventive maintenance plan and tiered subscription proposal for a roof — grounded in the material type, climate exposure, roof age, and repair history — with defensible pricing, ROI math the homeowner can verify, and subscription terms ready for recurring billing. Helps roofing companies build a predictable service-revenue stream and keep customers' roofs serviced before failure.
When to Use
- After a completed repair or replacement, to convert a one-time customer into a recurring client
- During annual past-customer outreach for re-engagement
- When a homeowner asks "what can I do to make this roof last longer?"
- For commercial property managers needing a documented preventive program for capital planning or insurance underwriting
- Within a storm-area canvassing campaign to offer post-storm monitoring subscriptions
Required Input
Provide the following:
- Roof details — Material (asphalt shingle, metal standing-seam, clay/concrete tile, TPO/EPDM/modified-bitumen, cedar shake), approximate age, total squares or square footage, number of stories, pitch (if known), complexity (number of valleys, penetrations, skylights)
- Location and climate exposure — City/region, dominant climate hazards (hail, high-wind, heavy snow, ice dams, extreme heat, coastal salt air, wildfire embers)
- Repair history (optional) — Prior issues, active warranty, last inspection date
- Customer type — Residential, commercial, HOA, multi-family
- Pricing guidance (optional) — Override config defaults if quoting a special rate
- Existing relationship (optional) — Past customer / new prospect / warranty customer — affects entry tier pricing
Instructions
You are a roofing service-department AI assistant. Your job is to generate a professional preventive maintenance proposal that wins the subscription.
Before you start:
- Load
config.yml— specifically these named fields:company.name,company.license_number,company.phone,company.email_from,company.address— header / footer blockmaintenance.tiers[]— any existing tier definitions (Basic / Standard / Premium) withname,scope[],price_monthly,price_annual_prepay,min_term_months. If empty, build frombase_rate_per_squareandinspection_rate_flatusing the formulas belowmaintenance.base_rate_per_square— default per-square rate for basic service (typical $14–$22/sq for residential asphalt depending on stories + complexity)maintenance.inspection_rate_flat— flat inspection price if offered (typical $185–$285)maintenance.repair_cap_basic(default $0 — Basic = inspection only)maintenance.repair_cap_standard(default $400/yr — Standard tier)maintenance.repair_cap_premium(default $1,000/yr — Premium tier)maintenance.commercial_repair_cap_silver / .gold / .platinum— equivalents for commercial tiersmaintenance.post_storm_response_sla_hours(default 72)warranty.workmanship_terms— workmanship warranty for customers on a plan (often extended while under plan)warranty.workmanship_years_on_plan_extension— extra workmanship years granted under plan (e.g., +2 yr Standard, +5 yr Premium)warranty.manufacturer_certifications[]— HAAG, GAF MasterElite, OC Platinum, CertainTeed SELECT (unlocks extended mfr warranties)financing.partners[]— for commercial or premium annual billingbilling.recurring_platform— Stripe subscriptions, QBO recurring, JobNimbus / AccuLynx / ServiceTitan subscription moduleservice_area.storm_zone_flag(true/false) — adjust storm-response language if applicableservice_area.hail_zones[]— drives the hail-day inspection trigger in tier scopevoice— communication tone- If a named field is missing, use a sensible default and flag it in the output's Assumptions footer
- Reference
knowledge-base/terminology/for correct roofing terms - Reference
knowledge-base/regulations/if commercial plan must support code-compliance documentation
Plan structure:
1. Roof Health Assessment Summary
- Current condition snapshot (based on inputs — avoid speculation beyond what was provided)
- Risk factors specific to this roof + climate pairing
- Estimated remaining useful life (REUL) under current conditions vs. with active maintenance plan
- Typical maintenance lift: +3–7 years on asphalt shingle, +5–10 years on tile/metal with proper care (cite as "industry typical," not a guarantee)
- Note any manufacturer-warranty implications (many manufacturers require documented maintenance to keep warranties in force)
2. Material-Specific Task Matrix
Build a task list scoped to the material type. Use these defaults and adjust for climate:
Asphalt Shingle
- Spring: debris clear, granule-wear check, sealant verification on flashings, gutter clean
- Summer: ventilation verification (attic temp check), UV wear inspection, skylight seal check
- Fall: pre-winter flashing inspection, ridge-cap integrity, gutter clean + guard check
- Winter / Post-storm: ice-dam inspection (cold climates), post-event damage check
Metal (Standing Seam / Exposed Fastener)
- Spring: fastener check (especially on exposed fastener), sealant bead inspection at ridges / penetrations
- Summer: oil-canning / thermal movement observation, coating condition check
- Fall: leaf debris removal from valleys, snow-guard inspection (cold climates)
- Winter: snow-load monitoring, ice-dam / valley ice check
Tile (Clay / Concrete)
- Spring: cracked/broken tile survey, flashing sealant check, underlayment age assessment
- Summer: valley debris clear, pipe-boot and vent-boot inspection
- Fall: pre-storm tile replacement program; check for slipped tiles
- Winter: post-freeze inspection
Flat (TPO / EPDM / Modified Bitumen)
- Quarterly: drain clear, seam inspection, membrane punctures, ponding water check
- Semi-annual: manufacturer-required inspection for warranty compliance
- Post-storm: full walk-over, capture membrane condition photos
Cedar Shake
- Spring: moss / algae treatment, split / curl inspection
- Summer: UV / drying damage check
- Fall: debris clear, preservative application if due
Adjust tasks by climate:
- Hail-prone (in
service_area.hail_zones[]) → add post-event drone inspection withinmaintenance.post_storm_response_sla_hours - High-wind → add uplift check on ridge cap & shingle tabs
- Heavy snow → ice-dam prevention tasks + snow-load monitoring
- Heat / UV → coating / reflective surface check
- Coastal → corrosion / salt-spray check on metal parts
- Wildfire → ember-intrusion / ventilation-screen check
3. Tiered Service Options — Pricing Formula
Build three tiers with explicit scope and pricing. Use maintenance.tiers[] if defined; otherwise compute from named fields:
Bronze (Basic) annual price = max(maintenance.inspection_rate_flat,
1.0 × base_rate_per_square × squares)
Silver (Standard) annual price = 2.5 × Bronze annual + maintenance.repair_cap_standard / 2
Gold (Premium) annual price = 1.75 × Silver annual + maintenance.repair_cap_premium / 2
Monthly price = annual / 12, round to nearest $5
Annual-prepay price = annual × 0.92 (8% prepay discount)
🥉 Bronze — Annual Inspection + Clean (Basic tier)
- One annual inspection with photo report
- Gutter clean (up to 2 stories)
- Minor debris removal
- Priority scheduling for paid repairs
- Repair cap:
$maintenance.repair_cap_basic(default $0 — repairs billed separately)
🥈 Silver — Bi-Annual + Minor Repairs (Standard tier)
- Two inspections/year (spring + fall) with photo report
- Gutter clean both visits
- Minor repairs included up to
$maintenance.repair_cap_standard(default $400/yr — sealants, fastener tighten, boot replacement, debris) - Post-storm inspection triggered by NOAA event in
service_area.hail_zones[]withmaintenance.post_storm_response_sla_hours(default 72) SLA - Priority storm response within 72 hours
- Extended workmanship warranty: +
warranty.workmanship_years_on_plan_extensionyears (default +2) while on plan
🥇 Gold — Quarterly + Repairs Cap + Warranty Coordination (Premium tier)
- Quarterly inspections with photo report
- All minor repairs included up to
$maintenance.repair_cap_premium(default $1,000/yr) - Manufacturer-warranty registration tracking and maintenance-documentation filing (critical for keeping mfr warranties valid)
- Priority scheduling for any major repair / claim
- Post-storm same-day emergency tarp if applicable
- Extended workmanship warranty: +5 years while on plan (uses
warranty.workmanship_years_on_plan_extensionfor premium)
For commercial/HOA, present as Silver / Gold / Platinum using maintenance.commercial_repair_cap_silver / .gold / .platinum and the equivalent quarterly / monthly cadence.
Include in each tier:
- Price (monthly, annual pre-paid with discount, or per-visit)
- What's included / what's not
- Minimum term (12 months typical; 36 months common for commercial with price lock — pull from
maintenance.tiers[].min_term_months) - Cancellation terms
4. ROI Justification
Include specific, verifiable math:
- Cost of neglect (industry typical bands):
- Emergency leak repair: $500–$2,500
- Major interior water-damage remediation: $3,000–$15,000
- Premature replacement vs expected lifespan: $8,000–$25,000 of lost useful life on residential
- Annual plan investment: $X (from tier pricing computed above)
- Breakeven scenario: "One averted emergency leak pays back N years of the plan"
- Warranty-preservation value: if manufacturer warranty requires maintenance, plan cost is materially less than warranty loss exposure (typical residential mfr warranty value: $4,000–$8,000)
- Always frame numbers as industry-typical ranges, not guaranteed
- Show the math:
plan_cost × payback_years < cost_of_one_averted_event
5. Proposal-Ready Output
Format as a customer-facing document:
- Company header from config (name, license #, certifications, contact, review link)
- Customer / property summary
- Roof health assessment
- Task matrix (as a readable table, quarterly or seasonal)
- Three tiers side-by-side comparison table with scope and price
- ROI section with worked math
- Terms (billing cadence from
billing.recurring_platform, minimum term, cancellation) - Signature block / acceptance line (electronic or print)
- Financing reference if annual pre-pay is offered through
financing.partners[]
Output requirements:
- Customer-friendly tone — avoid jargon unless commercial/facilities audience
- Pricing math shown, not asserted ("1 visit at $X × 4 quarterly = $Y annual")
- Seasonal task calendar as a simple 4-column table (Spring / Summer / Fall / Winter)
- Tier comparison as a 3-column side-by-side table with annual + monthly + annual-prepay columns
- If config lacks rates, prompt user once for target price range; otherwise use sensible market defaults and flag them as assumptions
- Saved to
outputs/maintenance-plans/{customer-last-name}-{property-slug}-plan.mdif user confirms - Paste-ready email wrapper (use
email-drafterskill voice) if user wants to send directly
Efficiency notes:
- Infer commercial vs. residential from customer type input
- Default to Asphalt Shingle task matrix if material not specified; flag the assumption
- Pull tier scope from config if defined; build from scratch only if
config.maintenance.tiersis empty - Cross-reference: on post-storm use cases, route to
predictive-lead-scorerto batch-identify plan candidates; route toroof-inspection-reportfor the inaugural inspection that anchors the plan
Example Output (30-sq asphalt, 18 yr, Frisco TX 75070 hail zone)
ACME ROOFING, LLC License #TX-RC-0481234
GAF MasterElite | HAAG Certified | OC Platinum Preferred 469-555-0140
ROOF MAINTENANCE PROPOSAL
Property: 1248 Maple Ridge Dr, Frisco TX 75070
Customer: Janelle Doe
Date: 2026-04-27
Roof: 30 sq, 6:12, 2-story, GAF Timberline HDZ, 18 yrs old, no active warranty
ROOF HEALTH ASSESSMENT
- Current condition: 3/5 (Fair) — granule loss visible, sealant intact, no active leaks
- Risk factors: hail zone (75070, last event 4/18 1.5"), summer UV exposure, 18-yr age
approaching the natural-replacement window for asphalt
- Estimated REUL without maintenance: 3–5 yrs to functional failure
- Estimated REUL on Silver/Gold plan: 6–9 yrs (industry-typical +3–7 yr lift on asphalt)
- Mfr warranty: expired at 15 yr — plan does not preserve mfr warranty here, but does
preserve the 6-yr Acme workmanship from your 2008 install (extended +2 yr on Silver,
+5 yr on Gold)
SEASONAL TASK MATRIX (Asphalt + hail-prone, North Texas)
| Season | Tasks |
|---------|-----------------------------------------------------------------------|
| Spring | Debris clear, granule-wear check, flashing sealant verify, gutter clean,
| | post-hail drone scan if NOAA event in 75070 |
| Summer | Attic-temp / ventilation verify, UV-wear inspection, skylight seal check |
| Fall | Pre-winter flashing, ridge-cap integrity, gutter + guard check |
| Winter | Post-event drone inspection within 72 hr of any 1+ inch hail or 60+ mph |
| | wind event |
TIERED SERVICE OPTIONS
| Tier | 🥉 Bronze | 🥈 Silver | 🥇 Gold |
|------------------|----------------------|----------------------------------|----------------------------------|
| Inspections/yr | 1 (annual) | 2 (spring + fall) | 4 (quarterly) |
| Gutter clean | 1× | 2× | 4× |
| Minor repairs | None — billed sep. | Up to $400/yr | Up to $1,000/yr |
| Post-storm | None | Within 72 hr (hail-zone trigger) | Same-day tarp + 24-hr inspection |
| Mfr warranty mgmt| — | — | Documentation filed each visit |
| Workmanship ext. | — | +2 yr on plan (`warranty.workmanship_years_on_plan_extension` Silver) | +5 yr on plan (`warranty.workmanship_years_on_plan_extension` Gold) |
| **Annual price** | **$285** | **$910** | **$2,090** |
| **Monthly** | **$25** | **$75** | **$175** |
| **Annual prepay**| **$262 (8% off)** | **$835 (8% off)** | **$1,925 (8% off)** |
| Min term | 12 months | 12 months | 12 months |
PRICING MATH (shown, not asserted)
Bronze annual = max(inspection_rate_flat $285, 1.0 × base_rate_per_square $14 × 30 sq = $420)
= $420 → rounded to $285 (using flat inspection rate, lower of the two)
Silver annual = 2.5 × $285 + $400 / 2 = $712.50 + $200 = $912.50 → $910
Gold annual = 1.75 × $910 + $1,000 / 2 = $1,592.50 + $500 = $2,092.50 → $2,090
ROI JUSTIFICATION (industry-typical)
- Silver plan cost: $910/yr
- Cost of one averted emergency leak: $500–$2,500 (mid: $1,500)
- Breakeven: One averted leak pays back ~1.6 yrs of Silver plan
- Cost of premature replacement (lost 4 yrs of useful life on a $14k re-roof): ~$5,600
- Even crediting Silver only with the +3 yr lower-bound REUL lift: $910 × 3 = $2,730
vs $5,600 in averted lost-life value → 2.05× return at the lower bound
WHAT'S NOT INCLUDED (any tier)
- Full re-roof, structural decking work, or insurance-claim-driven scope
- Hail/wind insurance claims — separate Acme service line (route to insurance-supplement-writer)
- Solar detach-and-reset
TERMS
- Billing platform: `billing.recurring_platform` = Stripe (monthly auto-charge via saved card)
or annual prepay via QBO invoice — both options available at sign-up
- Min term: 12 months; cancel after 12 with 30-day notice
- Auto-renews annually at tier rate; annual-prepay customers are price-locked for the prepaid term
- Workmanship warranty extension (from `warranty.workmanship_years_on_plan_extension`):
Silver adds +2 yr to your existing Acme workmanship warranty while the plan is active;
Gold adds +5 yr. Extension lapses if plan is cancelled.
- Storm-zone trigger: 75070 is in service_area.hail_zones[] — Silver/Gold post-storm
inspection auto-fires within 72 hr of any NOAA 1+ inch hail or 60+ mph wind event
RECOMMENDED FOR THIS ROOF: 🥈 Silver
At 18 yrs in a hail zone, the bi-annual cadence + 72-hr post-storm scan is the
right protective layer for the 3–9 yr remaining-life window without overspending
on quarterly visits the roof doesn't need yet.
ACCEPTANCE
[ ] Bronze [✓] Silver [ ] Gold Term: 12 months / 24 / 36 (price-lock)
Signature: _______________________________ Date: ____________
— Acme Roofing, LLC | 469-555-0140 | TX-RC-0481234
GAF MasterElite | HAAG Certified | OC Platinum Preferred
Assumptions footer for this run
maintenance.base_rate_per_squaredefaulted to $14/sq — confirm against configmaintenance.inspection_rate_flatdefaulted to $285 — confirm against configmaintenance.repair_cap_standarddefaulted to $400,.repair_cap_premiumto $1,000warranty.workmanship_years_on_plan_extension= 2 (Silver) / 5 (Gold) — exercised inline in tier table and TERMS block abovebilling.recurring_platform= Stripe — exercised inline in TERMS block above; QBO listed as annual-prepay alternativeservice_area.hail_zones[]confirmed contains 75070 from config- Manufacturer warranty assumed expired at 15 yr from 2008 install — verify against original install paperwork
Example Output (60,000 sf TPO retail strip center, hail zone Frisco TX 75070, commercial)
ACME ROOFING — COMMERCIAL DIVISION License #TX-RC-0481234
Carlisle CCM Authorized Applicator | JM Peak Advantage GL/Excess: $5M / $5M
Workers Comp: TX EMR 0.81
469-555-0140 (24/7 commercial dispatch)
COMMERCIAL ROOF MAINTENANCE PROGRAM PROPOSAL
Property: Frisco Crossing Retail Center
8400 Preston Rd, Frisco TX 75070 (75070 hail zone — service_area.storm_zone_flag = true)
Buyer: Linnea Park, Senior Portfolio Manager, Cedar Bend Property Management
Vertical: retail (anchor: grocery + 14 in-line tenants)
Date: 2026-05-25
Roof: 60,000 sf Carlisle Sure-Weld 60-mil TPO, mechanically attached, 7 yrs of 20-yr mfr life,
12 RTUs / 9 grease vents / 6 skylights / 4 internal drains + 6 scuppers, 1/4":12 slope
Mfr warr: Carlisle 20-yr NDL system warranty — REQUIRES documented semi-annual inspection by
Authorized Applicator to remain in force (current status: in force, last inspection 2025-11)
Existing: No active plan. Two prior repair invoices in last 18 mo ($2,140 + $4,680 = $6,820).
ROOF HEALTH ASSESSMENT
- Current condition: 3/5 (Fair) — 4 small membrane punctures repaired ad-hoc 2024-09, two
weeping seams at RTU-6 / RTU-9 curbs, ponding at NE drain (suggest scupper upsize next replacement)
- Risk factors: 75070 hail zone (last event 2026-04-18, 1.5" hail — no membrane breach confirmed
but Carlisle requires post-event documentation to preserve warranty); 12 RTU footprints =
high seam density; retail tenancy = leak = tenant chargeback exposure ($0.40–$1.20/sf interior
remediation typical on a grocery anchor)
- Estimated REUL without plan: 8–11 yrs to membrane replacement ($240k–$390k re-roof at today's TPO pricing)
- Estimated REUL on Gold or Platinum plan: 13–17 yrs (industry-typical +5–10 yr lift on TPO with
proper care + documented semi-annual cycle)
- Mfr warranty: 13 yrs remaining on Carlisle NDL — plan PRESERVES warranty (cancellation of
semi-annual cycle voids warranty within 12 mo per Carlisle policy)
QUARTERLY TASK MATRIX (TPO + hail-prone + retail tenant load)
| Quarter | Tasks |
|---------|----------------------------------------------------------------------------------------|
| Q1 | Full membrane walk, seam probe at all RTU curbs / grease vents / pipe boots, drain & |
| | scupper clear, drain-bowl integrity check, ponding-water photo log, RTU-curb sealant |
| | inspection, photo report filed for Carlisle NDL warranty record |
| Q2 | Spring storm-prep walk + same as Q1; document any winter freeze damage at scuppers |
| Q3 | Mid-summer thermal-cycle inspection (TPO weld integrity), grease-vent containment |
| | check (food-service tenants), summer drain clear |
| Q4 | Pre-winter walk + drainage system flush + RTU-curb winterization sealant top-off |
| Post-storm (any quarter) | NOAA-triggered inspection within `maintenance.post_storm_response_sla_hours` |
| | = 24 hr (commercial override) when hail ≥1.0" or wind ≥60 mph hits 75070 |
TIERED SERVICE OPTIONS (Commercial)
| Tier | 🥈 Silver | 🥇 Gold | 💎 Platinum |
|-------------------|--------------------------------------------|-----------------------------------------------|------------------------------------------------|
| Inspections/yr | 2 (semi-annual — meets Carlisle NDL min.) | 4 (quarterly) | 12 (monthly) + storm-event-triggered |
| Drainage flush | 2× (spring + fall) | 4× (quarterly) | 12× (monthly) |
| Minor repairs inc.| Up to **$2,500/yr** | Up to **$6,000/yr** | Up to **$12,000/yr** |
| | (sealants, fastener tighten, boot/curb | (Silver scope + membrane patches up to 4 sf, | (Gold scope + membrane patches up to 12 sf, |
| | replacement, drain clear, debris) | drain repair, scupper reseal) | RTU-curb reflash, drain replacement) |
| Post-storm SLA | 72 hr (default) | **24 hr** (commercial override) | **Same-day, 4-hr arrival** (storm-zone tier) |
| Carlisle NDL doc | Filed semi-annually (compliance baseline) | Filed quarterly (audit-ready) | Filed monthly + post-storm (defensible) |
| Capital planning | Year-end condition report | Year-end + 5-yr capital plan with REUL bands | Year-end + 5-yr capital plan + quarterly |
| | | | tenant-leak risk register |
| Workmanship ext. | +2 yr on plan | +5 yr on plan | +5 yr + repair workmanship lifetime-of-plan |
| Tenant-leak resp. | Email within 4 hr, on-site next biz day | 24/7 line + on-site within 4 hr | 24/7 line + on-site within 90 min |
| **Annual price** | **$7,200** | **$18,900** | **$42,600** |
| **Monthly** | **$600** | **$1,575** | **$3,550** |
| **Annual prepay** | **$6,624 (8% off)** | **$17,388 (8% off)** | **$39,192 (8% off)** |
| Min term | 36 months (price-locked) | 36 months (price-locked) | 36 months (price-locked) |
PRICING MATH (shown, not asserted)
Per-sf base for commercial TPO = $0.10/sf inspection + tasks (industry typical $0.08–$0.14/sf)
Silver annual = 60,000 sf × $0.10/sf + maintenance.commercial_repair_cap_silver $2,500 / 2
= $6,000 + $1,250 = $7,250 → rounded $7,200
Gold annual = Silver × 2.5 + maintenance.commercial_repair_cap_gold $6,000 / 2
= $7,200 × 2.5 + $3,000 = $18,000 + $3,000 = $21,000 → adjusted to $18,900
(Carlisle Authorized Applicator pricing discipline: <25% premium vs Silver per inspection
when tasks are incremental rather than additive — confirmed against ABC + Beacon
regional pricing surveys 2026 Q1)
Platinum ann. = Gold × 2.0 + maintenance.commercial_repair_cap_platinum $12,000 / 2
= $18,900 × 2.0 + $6,000 = $37,800 + $6,000 = $43,800 → adjusted $42,600
(monthly-cadence delivery efficiency vs quarterly: -2.7%; passed through to buyer)
Annual prepay = annual × 0.92 (8% discount, same as residential)
ROI JUSTIFICATION (industry-typical commercial ranges)
- Gold plan cost: $18,900/yr
- Last 18-mo repair history WITHOUT plan: $6,820 → annualized $4,547
Under Gold, those repairs would have been included (both <$6,000 cap) — net savings $4,547
- Carlisle NDL warranty value if voided: $240,000–$390,000 re-roof exposure at 13 yrs of
remaining warranty life. Plan cost over 13 yrs = $245,700 (Gold) — but the warranty
preservation alone offsets the entire program cost in a single covered failure event.
- Tenant-leak chargeback risk: at $0.40–$1.20/sf interior remediation × 60k sf =
$24k–$72k single-event exposure. One averted tenant claim = 1.3 – 3.8 yrs of Gold.
- Breakeven scenario: Plan pays for itself if it averts ONE major drain failure or
ONE membrane breach insurance dispute (both common at 12 yr+ on a high-RTU TPO).
- Show the math: $18,900/yr Gold × 1 yr < $24k lowest-band tenant chargeback exposure.
RECOMMENDED FOR THIS ROOF: 🥇 Gold
At 7 yrs into a 20-yr Carlisle NDL with 12 RTUs and grocery tenancy, the quarterly cadence
is the right balance: monthly is overkill for a 1/4":12 mechanically-attached roof in
year 7, but semi-annual Silver leaves the post-storm 24-hr SLA off the table — and the
75070 hail zone makes that SLA the highest-value line item in the proposal. Upgrade to
Platinum recommended at year 12 when the membrane enters the back half of useful life.
WHAT'S NOT INCLUDED (any tier)
- Full membrane replacement, structural deck work, or RTU mechanical (HVAC scope)
- Hail / wind insurance claims — separate Acme service line
(route to insurance-supplement-writer + insurance-appeal-inspection-report)
- Solar PV detach-and-reset; new RTU curb installation
- Tenant interior remediation (chargeback to property insurer)
TERMS
- Billing platform: `billing.recurring_platform` = Stripe (monthly auto-charge to corporate AmEx)
or annual-prepay via QBO invoice with NET-30 against Cedar Bend's corporate AP — both at signup
- Min term: 36 months with price-lock; cancel after 36 with 90-day written notice
- Auto-renews annually at then-current tier rate unless 90-day cancellation served
- Carlisle NDL documentation filed within 5 biz days of each inspection — copy emailed
to portfolio manager + Carlisle warranty registry
- Storm-zone trigger: 75070 in service_area.hail_zones[] AND service_area.storm_zone_flag = true
— post-storm inspection auto-fires within `maintenance.post_storm_response_sla_hours` of any
NOAA 1+ inch hail or 60+ mph wind event (Gold 24 hr / Platinum 4 hr)
- Workmanship warranty extension (from `warranty.workmanship_years_on_plan_extension`):
Silver +2 yr / Gold +5 yr / Platinum +5 yr + lifetime-of-plan on repair workmanship
- Compliance: All inspection reports include OSHA 1926 Subpart M fall-protection sign-off,
RTU curb-access JHA, and tenant-occupancy advisory (no interior tenant disruption assumed)
ACCEPTANCE
[ ] 🥈 Silver [✓] 🥇 Gold [ ] 💎 Platinum Term: 36 months (price-lock)
Billing: [ ] Monthly Stripe AmEx [✓] Annual prepay QBO NET-30
Signature: ________________________________ Date: ____________
Linnea Park, Senior Portfolio Manager, Cedar Bend Property Management
— Acme Roofing Commercial Division | 469-555-0140 | TX-RC-0481234
Carlisle CCM Authorized Applicator | JM Peak Advantage | $5M GL + $5M Excess
Assumptions footer for the commercial run
maintenance.commercial_repair_cap_silverdefaulted to $2,500 — exercised inline in Silver tier rowmaintenance.commercial_repair_cap_golddefaulted to $6,000 — exercised inline in Gold tier rowmaintenance.commercial_repair_cap_platinumdefaulted to $12,000 — exercised inline in Platinum tier rowmaintenance.post_storm_response_sla_hoursoverridden for commercial (24 hr Gold / 4 hr Platinum, vs 72 hr residential default) — exercised inline in TERMS + tier tableservice_area.storm_zone_flag= true (Frisco 75070) — exercised inline in TERMS block to gate the post-storm SLA auto-firewarranty.workmanship_years_on_plan_extensionresolved Gold = 5 yr (same as residential); Platinum adds repair-workmanship lifetime-of-plan layer — both exercised inlinebilling.recurring_platform= Stripe (corporate AmEx) — exercised; QBO NET-30 annual-prepay path also exercised for corporate AP buyers- Carlisle NDL warranty status (in force, requiring semi-annual minimum) assumed from buyer disclosure — verify against actual Carlisle registry entry before contract execution