Pre-Task Plan Drafter
Generate a daily, task-by-task **Pre-Task Plan** (PTP, sometimes called Pre-Task Safety Analysis or Pre-Shift Plan) that the crew leader can hand-write final corrections on, walk through with the crew at the morning huddle, post at the work area, and have signed off before work begins. The output covers the day's specific scope, the crew on it, the energy sources to be isolated, the controls in place, the PPE and rescue equipment required, the adjacent-trade and weather conditions that change the day's risk, and a stop-work trigger list calibrated to the actual hazards — not a generic template. This is the **daily** safety document, distinct from the project-level Site-Specific Safety Plan (the SSSP / safety-plan-builder output) and from the weekly toolbox-talk (which is a tactical safety briefing, not a task plan).